Updated on November 19, 2026
In 2027, the EPBD directive provides for at least one charging point per 10 spaces in non-residential parking lots with more than 20 spaces, but this rule will only apply in France once it has been transposed. For a general services manager or a CFO whose parking lot already complies with the Loi LOM, the question is a practical one: do we need to invest again, how much, and when?
What is the EPBD directive and why does it concern EV charging stations?
The EPBD directive (Energy Performance of Buildings Directive), or Directive (EU) 2024/1275 on the energy performance of buildings, is the European text that sets building performance rules. Its Article 14 also asks Member States to ensure that parking lots are properly equipped: charging points, pre-cabling, ducting and bicycle parking.
Adopted on April 24, 2024, it is addressed, like any directive, to Member States: each country must write it into its national law, which is called transposition.
What does the EPBD directive provide for 2027 in the parking lots of non-residential buildings?
For 2027, the EPBD directive asks Member States to ensure that every non-residential building with more than 20 spaces has at least one charging point per 10 spaces, or ducting for at least half of the spaces.
This requirement also covers existing buildings: offices, shops, hotels, industrial sites. Two dates follow one another: Member States had to transpose the directive by May 29, 2026 at the latest (Article 35), and must ensure that parking lots are equipped by January 1, 2027 at the latest (Article 14, paragraph 2).
Two provisions in Article 14, paragraph 2, extend this deadline: for buildings owned or occupied by public bodies, pre-cabling for at least 50% of spaces may be completed by January 1, 2033 at the latest, and Member States may postpone the requirement to January 1, 2029 for non-residential buildings renovated in the two years before May 28, 2024.
What requirements apply to a new non-residential building or one undergoing major renovation?
Beyond 5 spaces, the directive provides for at least one charging point per 5 spaces (one per 2 in offices), pre-cabling for at least half of the spaces and ducting for the rest. In a major renovation, these requirements apply if the works concern the parking lot or the electrical installation. Member States may waive them where the charging and connection installations cost at least 10% of the renovation (Article 14, paragraph 5).
Does the EPBD directive already apply in France?
Not yet as such: the EPBD directive is addressed to Member States, and France has not yet transposed its parking lot rules. It was due to be transposed by May 29, 2026 at the latest, but the transposition law has not been adopted and the decree that will set the thresholds has not been published.
The applicable law remains article L113-13 of the French Construction and Housing Code (CCH), which comes from the Loi LOM and has been unchanged since 2021: since January 1, 2025, parking lots with more than 20 spaces must have one charging point on a space accessible to persons with reduced mobility (PRM), then one per additional 20-space tranche, i.e. at least 4 points for 95 spaces. The number of points may be limited if major works are needed on the grid upstream of the electrical panel.
Where does the infringement procedure against France stand?
On July 15, 2026, the European Commission sent letters of formal notice to the 27 Member States, including France, for incomplete transposition of the directive. This is the first step of the procedure. As of October 1, 2026, no reasoned opinion, the next step, targeted France (decisions of October 1, 2026).
Where does the 2026 DDADUE bill that transposes the EPBD directive stand?
The 2026 DDADUE bill, adopted by the Senate on February 18, 2026, was sent back to committee and has not yet been examined by the National Assembly (as of November 12, 2026). Its Article 45 provides for controllable charging points, or the necessary infrastructure, by January 1, 2027; a decree will set the thresholds. The text may still be amended.

How many charging stations will a company parking lot need in 2027?
As long as the EPBD directive has not been transposed, a parking lot with more than 20 spaces must have one point, then one per additional 20-space tranche. If France adopts the European ratio (at least one per 10), 95 spaces will require at least 10 instead of 4, or ducting for at least 48 spaces.
Scenario if France adopts the directive's minimum ratio; the transposition decree will set the thresholds. For 95 spaces, the directive's values (9.5 points, 47.5 spaces) are rounded up to the next whole number as a precaution: the directive does not specify how to round. Example of 95 spaces under the Loi LOM: Service-Public.
Two French exemptions apply (article L113-14 of the CCH): buildings owned and occupied by an SME, and major renovations where the cost of charging and connection exceeds 7% of the total cost of the works (10% in the bill). The directive provides no SME exemption.
For the current rules, read our guide to Loi LOM obligations for EV charging stations and our article on company obligations for EV charging stations.

How to prepare your parking lot for the 2027 deadline without overspending?
Prepare your parking lot for the 2027 deadline by sizing the electrical installation for the directive scenario, without installing all the points at once. Lay the ducting and fit a suitable electrical panel, install the points required by the Loi LOM, and manage power so you can charge more vehicles without increasing your subscribed power.
- Count your points. For 70 spaces: 3 points under article L113-13 of the CCH, at least 7 in the directive scenario.
- Size the panel and lay the ducting. You will be able to add points without reopening the floor.
- Manage power. Smart charging shares the available power: more vehicles charged, without increasing your subscribed power.
Budget: see the installation cost of a company charging station and our solutions for businesses. For a hotel, a campsite or a golf course, Qovoltis finances all the equipment and installation: zero investment for the venue, which earns a commission on every session (hospitality offer).
FAQ
Is an SME exempt from EV charging obligations?
Yes, but only if all conditions are met: the company owns and occupies the building, has fewer than 250 employees, and its turnover does not exceed €50 million or its balance sheet total €43 million (Recommendation 2003/361/EC, article L113-14 of the CCH). An SME that rents does not benefit. This exemption exists only in French law: the EPBD directive does not provide one.
Are hotels affected by the 2027 deadline?
Yes, a hotel is a non-residential building: if it has a parking lot of more than 20 spaces, it falls within the scope of Article 14 of the EPBD directive, subject to its transposition. Unless it qualifies for the SME exemption, it is already subject today to article L113-13 of the CCH: one point, then one per additional 20-space tranche, i.e. at least 4 points for 95 spaces.
Do you have to install charging stations before January 1, 2027?
There is no obligation today under the EPBD directive, as long as it has not been transposed. But the date of January 1, 2027 is already in the transposition bill: if the text is adopted in early 2027, the deadline will already have passed. Anticipating is therefore prudent; the Loi LOM (article L113-13 of the CCH) has applied since January 1, 2025.
What does the EPBD directive change for smart charging?
The EPBD directive asks Member States to ensure that the charging points it provides for allow smart charging and, where appropriate, bidirectional charging, with interoperable, patent-free protocols (Article 14, paragraph 6). The transposition bill refers to “controllable” charging points.
Key takeaways
- The EPBD directive provides, by January 1, 2027 at the latest, for at least one charging point per 10 spaces in non-residential parking lots with more than 20 spaces, or ducting for at least half of the spaces.
- The transposition bill has not yet been examined by the National Assembly.
- The rule in force remains one point, then one per additional 20-space tranche (article L113-13 of the CCH).
- For 95 spaces: from 4 to at least 10 points (or ducting for at least 48 spaces), if France adopts the directive's ratio.
Further reading
- Loi LOM and EV charging stations: the obligations
- EV charging station obligations for companies: what the law says
- Installation cost of an EV charging station for a company
- EV charging obligations for campsites
- Qovoltis customer cases
Sources and references
- Directive (EU) 2024/1275 of April 24, 2024 on the energy performance of buildings, Article 14 and Article 35 (transposition), EUR-Lex
- Law no. 2019-1428 of December 24, 2019 on mobility orientation (LOM), Article 64, Légifrance
- Article L113-13 of the French Construction and Housing Code, Légifrance
- Article L113-14 of the French Construction and Housing Code, Légifrance
- Commission Recommendation 2003/361/EC of May 6, 2003 concerning the definition of SMEs, EUR-Lex
- Bill no. 2518 adopted by the Senate (2026 DDADUE), Article 45 and legislative file, National Assembly
- European Commission press release of July 15, 2026 on the transposition of the EPBD directive
- European Commission infringement decisions of October 1, 2026 (energy)
- Mandatory EV charging infrastructure, Service-Public
Article written in November 2026. Information verified as of the publication date. The transposition of the EPBD directive is under way: thresholds may change with the publication of the law and its implementing decree. This article is provided for information purposes only and does not constitute legal advice.