News

EV charging stations for casinos: the complete guide by Qovoltis

EV charging station for casino: the complete guide by Qovoltis

Summarize this article with AI

Updated 08/13/2026

The essentials in 30 seconds
  • Every casino (except SMEs) with a parking lot of more than 20 spaces has been subject to the LOM law since January 1, 2025: at least 1 PRM-accessible charging point + 1 charging point per additional 20 spaces. Exemptions do exist, though — we explain everything in a dedicated article on the LOM law.
  • A casino visit lasts on average 3 to 8 hours; a 22 kW AC charging station is more than enough to fully charge a vehicle.
  • Two models with Qovoltis: self-funded investment (€3,000 to €5,000 / charging station) or third-party investment (installation, monitoring, and maintenance at no cost)
  • Commissioning time: 8 to 10 weeks with an existing meter, 18 weeks if a new Enedis connection point is required

In 2026, equipping your casino with charging stations meets three simultaneous imperatives: a legal obligation, growing customer expectations, and a credible CSR positioning. This guide details why, how many, and how to go about it.

Why equip your casino with charging stations in 2026?

Casino building facade with illuminated sign, a public establishment (ERP) subject to EV charging obligations
Photo: Pexels / matreding

A service expected by your clientele

Your customers are among the first to drive electric vehicles. The correlation between high-income demographics and early EV adoption is well-documented: in 2026, electric vehicle drivers represent a high-spending clientele accustomed to premium services, who plan their charging stops before choosing their leisure destination.

Casino visitors typically spend several hours on-site, taking time to enjoy the games, restaurants, bars, or shows. This parking duration is perfectly suited for AC charging, which allows for significant range recovery during their visit.

The presence of an electric vehicle charging station encourages drivers to extend their stay while charging, thereby creating more opportunities to enjoy the casino's services.

Your parking lot is not just a place to park: it is a service infrastructure. A casino that does not offer charging stations risks losing customers to a better-equipped competitor.

A legal obligation (LOM law / ERP regulations)

Casinos are public-access buildings (ERP). As such, they are subject to Law No. 2019-1428 on Mobility Orientation (LOM), clarified by Decree No. 2021-546 of May 4, 2021, which has mandated the installation of charging stations in all non-residential parking lots with more than 20 spaces since January 1, 2025.

The requirement is clear: at least 1 accessible station for people with reduced mobility + 1 station for every additional 20 spaces. For a 60-space parking lot, this means a minimum of 3 operational stations.

Non-compliance can result in a fine of up to €45,000 (Article L183-4 of the CCH). To understand these requirements in full, check out our guide on the LOM law and charging stations.

Which cases qualify for an exemption?

  1. SME owner-occupier (Art. L113-14 2° of the CCH): total exemption if the building is owned and occupied by an SME as defined by European standards (fewer than 250 employees and turnover < €50M or balance sheet < €43M)
  2. Installation cost exceeding 7% of the renovation cost (Art. L113-14 1°): if the cost of the charging stations exceeds this threshold during major works, the requirement is waived
  3. Upstream main switchboard work more expensive than downstream work (Art. L113-13 para. 2): if the electrical system upgrade costs more than the installation of the charging stations, the required number is capped

A CSR and differentiation lever

The leisure sector is under pressure to demonstrate concrete environmental commitments. Installing charging stations sends a clear signal: you are promoting low-emission mobility, reducing your visitors' carbon footprint, and making it tangible with every visit. It is also a key differentiator against the competition: in a sector where customer experience is paramount, providing charging stations contributes to an establishment's promise of excellence.

How much does installation cost and which model should I choose?

The cost depends on the number of charging stations, the chosen power output, and the selected operating model. There are two main options:

Criteria Option 1: Self-funded investment Option 2: Qovoltis third-party investment
Initial installation cost €3,000 to €5,000 / charging station €0 (100% covered)
Monthly operating costs €10 to €15 / charging station (monitoring) €0
Maintenance & Replacement Borne by the establishment 100% managed by Qovoltis
Revenue for the casino 100% of the session price (excluding fees) 5 to 10% commission for the casino

With the third-party investment model, Qovoltis finances, installs, supervises, and maintains the charging stations at its own expense. You provide the parking space and receive a commission on every charging session. It is the ideal model for getting equipped without tying up capital expenditure.

Lifespan and return on investment

Qovoltis charging stations come with a 7-year warranty and have an average lifespan of 10 to 15 years. With the third-party investment model, the question of lifespan is irrelevant: Qovoltis manages the entire lifecycle.

What type of charging station should I choose for a casino?

AC or DC stations: which should you choose for a casino parking lot?

There are two types of charging stations:

The AC (alternating current) stations deliver 7.4 kW to 22 kW. Charging is gradual, which is perfect for long-term parking.

The DC (direct current) stations allow for fast charging starting at 50 kW in 20 to 45 minutes, but they require heavy electrical infrastructure and a much higher investment.

For a casino, we recommend AC stations. The average duration of a casino visit (3 to 8 hours) is perfectly aligned with the charging time of a 22 kW AC station: there is no need to invest in fast DC charging. An AC station is also less expensive to install and allows for more charging points to be deployed without overloading the electrical system. To learn more about the technical differences, read our article AC or DC: how to choose your charging station.

Managing high turnover and shift work

Casinos have a unique characteristic: they often operate around the clock, with customer turnover in the evenings, at night, and on weekends. In this context, two requirements are essential: increasing the number of available charging points and allowing customers to pay for their charging independently, without tying up your staff.

The Qobox E is the Qovoltis charging station designed for high-turnover environments. It offers a dual simultaneous socket (two vehicles charging at the same time on a single unit) and integrates payment directly via badge, QR code, or card terminal. Your customers manage their charging independently, at any time.

Three Qovoltis EV charging stations installed in a parking area with reserved electric vehicle bays

Thanks to Qockpit, the Qovoltis supervision platform, you can monitor the status of your charging stations, consumption, and billing in real time, 24/7.

Valet parking and electric vehicles

In a casino offering valet service, electric vehicles are systematically plugged in upon arrival if the charge level warrants it. The valet has access to the supervision platform to track the charging status of each vehicle and free up the stations at the right time.

Charging is offered as an included service for customers, just like the valet parking itself.

How does a Qovoltis installation work in a casino?

An installation follows a five-step process, from the initial study to daily operation.

1. Project study and qualification. After an initial discussion to validate your establishment's eligibility and the project's feasibility (available parking, electrical capacity, number of stations), our teams conduct a personalized technical study.

2. Technical Layout Projection. A summary document is provided to the establishment: layout diagram, technical specifications of the stations, electrical sizing, and a project timeline leading up to commissioning.

3. Signature and administrative procedures. Qovoltis handles all procedures: Enedis connection, Consuel, EVSE certifications, AFIR compliance, NF C 15-100 and GDPR.

4. Installation and commissioning. Installation is carried out by EVSE-qualified technicians. The lead time is 8 to 10 weeks with an existing meter, or 18 weeks if a new Enedis delivery point (PDL) needs to be created.

5. Operation and maintenance. Qovoltis provides 24/7 remote monitoring, preventive and corrective maintenance, as well as back-office management (depending on the chosen model).

Free audit and quote within 48h

Qovoltis assesses your situation and offers you a complete action plan for your establishment.


FAQ

Is my casino subject to the LOM law requirements?

Yes, if your parking lot has more than 20 spaces and your casino is a company with more than 250 employees (or meets the financial criteria: turnover > €50M or balance sheet > €43M).

For a new building or one undergoing major renovation (permit filed after March 11, 2021), the threshold drops to 10 spaces, regardless of the size of the establishment.

How do I charge my customers for charging?

Three models coexist: offering charging for free as a premium service included in the experience; charging per session via badge, QR code, or mobile app; or bundling charging into VIP or loyalty packages. The Qovoltis third-party investment model includes full management of pricing and billing, automated via Qockpit.

What is the budget for installation?

With a direct investment, expect €3,000 to €5,000 per charging station depending on the number of units and existing electrical configuration, plus €10 to €15 per month per station for supervision. With the Qovoltis third-party investment model, the budget is €0 : installation, supervision, and maintenance are fully covered.

What subsidies are available for public-access buildings?

Direct national subsidies like the ADVENIR program are no longer available for public-access buildings in 2026. This makes the third-party investment model even more relevant. However, other levers remain: some regions co-finance sustainable leisure projects, and charging infrastructure may qualify for tax depreciation benefits depending on the establishment's legal structure.

Key takeaways

Equipping your casino with charging stations in 2026 addresses three imperatives: a legal obligation (LOM law), a concrete expectation from your high-income clientele, and a differentiating CSR position. With an average stay of 3 to 8 hours, AC stations are ideal: they fully charge a vehicle without requiring heavy infrastructure.

The Qovoltis third-party investment model allows you to get equipped without any upfront costs, with 24/7 supervision and maintenance guaranteed throughout the term. The right time to start is now.

Learn more

Sources and references

Article written in August 2026. Information verified as of the date of publication. This article is provided for informational purposes only and does not constitute legal advice.

Ce livre blanc vous intéresse ?

N'hésitez pas à nous faire une demande de contact.